Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum antenna enclosure size6 cuft
Each antenna is located inside an enclosure of, or the antenna and all its exposed elements could fit within an imaginary enclosure of, no more than six cubic feet
- Maximum equipment size28 cuft
all other equipment associated with the facility does not exceed 28 cubic feet
From the ordinance
small cell telecommunications facilities shall be permitted by-right in all zoning districts subject to the following general performance standards.