Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum towers per parcel1 count
No more than one commercial communication tower shall be constructed on a single tax parcel.
- Removal time after cessation6 months
All obsolete or unused facilities must be removed within six months of cessation of operations at the site.
- Signage prohibition
The use of any portion of a commercial communication tower for signs other than warning or equipment information signs is prohibited.
- Tower setbackSetbackThe distance a building must be held back from a lot line. ratio2 ft per ft heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.
Commercial communications towers shall have a minimum front, side and rear yard equal to two feet for every one foot of tower height.
From the ordinance
Commercial communications towers shall have a minimum front, side and rear yard equal to two feet for every one foot of tower height.