Dimensional standards
Servicing
- Applies near
- R-1 and R-2 districts
- Geographic extent
- Applies in R-1 and R-2 districts
Uses
Conditional / special use1
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Height
- HeightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. by rightBy rightPermitted outright: if the plans meet the written rules, permission cannot be withheld.60 ft
Windmills on structures of less than 60 feet shall be permitted by right.
- HeightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. requiring special exception60 ft
Windmills on structures of 60 feet or greater shall require a special exception permit.
Other
- Multiple windmills
The installation of multiple windmills on a single site shall require a conditional use permit. Multiple windmills shall consist of more than two windmills on a single property.
Setback
- SetbackSetbackThe distance a building must be held back from a lot line. from residential structure
Minimum setback from base of pole or tower to any residential structure on adjoining lot shall be at least equal to 40 percent of the height of the tower.
From the ordinance
Windmills on structures of less than 60 feet shall be permitted by right. Windmills on structures of 60 feet or greater shall require a special exception permit.