Dimensional standards
Lot
- Minimum lot areaMinimum lot areaThe smallest parcel on which the district allows anything to be built.
- 30,000 sq ftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000. (0.69 acacre43,560 square feet — about the size of an American football field without the end zones.)
- Minimum lot depth
- 200 ft
Uses
Permitted by right29
- Agriculture
- Silvicultural activities
- Parks and recreation
- Park and ride facility
- Post office
- Public maintenance facility
- Utility service/minor
- Auction establishment
- Bank
- Business support service
- Business or trade school
- Construction office, temporary
- Equipment sales and rental
- General service and repair
- Mini warehouse
- Motor vehicle/outdoor storage
- Motor vehicle repair service/major
- Office, general
- Taxidermy
- Truck stop
- Contractor's yard
- Convenience center
- Custom manufacturing
- Industry, Type I
- Laboratory
- Warehousing and distribution
- Parking facility
- Reconstructed wetland
- Windmill
Conditional / special use13
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Height
- HeightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. increase condition
The height limit shall be 35 feet in height. The height limit for principal structures may be increased to 70 feet or up to five stories, whichever is lesser; provided, that each required yard is increased one foot for each additional foot of principal structure height over 35 feet.
Other
- Buffer yardYardThe open space left between a building and its lot line — the space a setback creates. required
a buffer yard is required on lots adjacent to residential and agricultural zoning districts (see section 5-400)
- Building separation30 ft
Where structures exceed the 35-foot height requirement a building separation of 30 feet shall be required.
From the ordinance
Minimum lot area: 30,000 square feet... Minimum lot width: On existing public roads: 150 feet... All structures: 75 feet... Minimum front yard setbacks: On primary highway: 75 feet... Minimum side yard setback: None, but a buffer yard is required on lots adjacent to residential and agricultural zoning districts... Minimum rear yard setback: All structures: 25 feet