Dimensional standards
Uses
Conditional / special use1
Extracted standards
17 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Environmental
- Groundwater monitoring
Ground water monitoring to assess the level of groundwater contamination shall take place prior to, during, and upon construction of the project.
- Protect floodplains, wetlands, steep slopes
All floodplains, wetlands, and steep slopes shall be protected from clearing, grading, filling, or construction.
Fencing & walls
- Minimum fence heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.6 ft
Security fencing shall enclose the project area at least six feet in height.
Historic
- Avoid historicHistoric districtAn area where exterior changes need design review to protect its character. sites
The layout shall be designed to avoid historic, archeological or cultural sites.
Landscaping & trees
- Minimum vegetative buffer width300 ft
The buffer shall consist of a landscaping strip at least 300 feet wide.
- Preserve tree lines
The layout shall be designed to preserve and maintain existing tree lines between fields or meadows, pastures, orchards, and mature woodlands.
Lighting
- Dark sky compliant
Lighting on the site shall be dark sky compliant.
Noise
- Noise standard
Noise requirements for solar energy projects shall be no more stringent than noise requirements for other types of development in the underlying zoning district.
Other
- Annual inspection
All active solar energy facilities shall be inspected by county staff on an annual basis.
- Decommissioning time6 months
The project shall be deconstructed and removed within six months after the project sites are permanently decommissioned.
- SetbackSetbackThe distance a building must be held back from a lot line. between fence and buffer25 ft
A 25 foot setback shall be provided between perimeter security fencing and vegetative buffer for emergency access.
- Maximum clearing per phase100 acresacre43,560 square feet — about the size of an American football field without the end zones.
Site clearing shall not exceed 100 acres for each phase of development.
- Minimum distance from airport5,280 ft
These facilities shall not be located within one mile of an airport unless the applicant submits... certification from the FAA.
- Minimize development on open fields
The layout shall be designed to minimize development on open fields and pastures.
- Preserve views
Existing views from public thoroughfares shall be preserved.
- Removal of inoperative components6 months
All inoperative components of the facility shall be removed from the project parcels within six months of inoperability.
Signage
- Sign restrictions
Warning signage shall be placed on solar equipment... no advertising except identification.
From the ordinance
The project area shall be set back at least 300 feet from all abutting public rights of way and main buildings on adjoining parcels and from adjacent property lines. Ground-mounted solar energy generation facilities shall not exceed a height of 18 feet.