Dimensional standards
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Ground-mounted solar collector front setbackSetbackThe distance a building must be held back from a lot line.
Ground-mounted solar collectors located within a front yard shall meet the minimum setback required for the principal structure or use in the applicable zoning district where located and shall be sited as far back as the principal structure or use.
- Ground-mounted solar collector maximum heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.15 ft
The maximum height of a ground-mounted solar collector shall be 15 feet as measured from the grade or base of the collector to its highest point and shall not exceed the height of the principal structure or use.
- Ground-mounted solar collector side/rear setbackSetbackThe distance a building must be held back from a lot line.10 ft
Ground-mounted solar collectors shall not be located within ten feet of any side or rear lot line.
- Solar collector maximum area relative to principal structure
Roof-mounted or ground-mounted solar collectors shall not exceed the square footage of the principal structure or use
From the ordinance
Distributed solar energy facility shall be considered an accessory use to be used to meet energy demands on-site and include rooftop and groundmounted photovoltaic arrays on residential, commercial, and industrial properties.