Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- POD unit maximum duration6 months
Portable on demand storage (POD) units shall be considered a temporary structure. They are permitted for use for a total of six months, after which a zoning permit must be obtained through the planning and zoning department.
From the ordinance
Portable on demand storage (POD) units shall be considered a temporary structure. They are permitted for use for a total of six months, after which a zoning permit must be obtained through the planning and zoning department.