Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Co-location heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. increase max5 ft
Co-location permitted by right if height not increased by more than 5 ft.
- CUP required above 125 ft125 ft
Any tower in excess of 125 ft requires conditional use permit.
In all other instances setback no less than 25 ft.
- SetbackSetbackThe distance a building must be held back from a lot line. from residential structure40 pct
Minimum setback from base to residential structure at least 40% of tower height.
- SetbackSetbackThe distance a building must be held back from a lot line. from road ROW50 ft
Minimum setback from property line abutting road ROW for associated building 50 ft.
From the ordinance
Communication tower: setback 40% of height from residential, 50 ft from road ROW, 25 ft otherwise, co-location allowed if height increase <=5 ft, >125 ft require CUP.