Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Excavation setbackSetbackThe distance a building must be held back from a lot line. from dwellings200 ft
At least 200 ft from any dwelling or property lines in platted subdivision.
- Excavation setbackSetbackThe distance a building must be held back from a lot line. from property lines50 ft
Excavations confined to areas at least 50 ft from all adjoining property lines.
- Excavation setbackSetbackThe distance a building must be held back from a lot line. from R-1/R-2/Business100 ft
At least 100 ft from any adjoining property lines in R-1/R-2 or Business District.
- Excavation setbackSetbackThe distance a building must be held back from a lot line. from road ROW200 ft
At least 200 ft from right-of-way lines of any street, road, highway.
- Machinery building setbackSetbackThe distance a building must be held back from a lot line.600 ft
Building containing power machinery at least 600 ft from adjacent property in R-1/R-2/Business or ROW.
From the ordinance
Mining: excavations 50 ft from property lines, 100 ft from R-1/R-2/Business, 200 ft from dwellings, 200 ft from ROW, 600 ft for machinery.