Surry, Virginia · General provision

Sec. 4-516

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Maximum extension for reconstruction180 days

    A one time extension of up to 180 additional days may be granted

  • Maximum placement period12 months

    The period for temporary placement of such structures shall be no more than 12 months

  • Maximum units per lot1 unit

    Only one temporary emergency housing unit shall be permitted on any lot of record.

  • Removal days after certificate of occupancy30 days

    The temporary emergency housing must be removed within 30 days after a final certificate of occupancy has been issued

From the ordinance

The period for temporary placement of such structures shall be no more than 12 months
Sec. 4-516