Southampton County Unincorporated, Virginia · General provision
Sec. 18-573
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Zoning permit validity6 months
valid for a period of six (6) months
From the ordinance
No building shall be erected, constructed, altered, moved, converted, extended, or enlarged, without the owner first having obtained a zoning permit. Such permit shall require conformity with the provisions of this chapter. When issued, such permit shall be valid for a period of six (6) months unless a longer period of time is specified thereon in accord with the terms of this chapter.