Southampton County Unincorporated, Virginia · General provision

Sec. 18-573

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Zoning permit validity6 months

    valid for a period of six (6) months

From the ordinance

No building shall be erected, constructed, altered, moved, converted, extended, or enlarged, without the owner first having obtained a zoning permit. Such permit shall require conformity with the provisions of this chapter. When issued, such permit shall be valid for a period of six (6) months unless a longer period of time is specified thereon in accord with the terms of this chapter.
Sec. 18-573