Page County Unincorporated, Virginia · General provision

Data Center

Dimensional standards

Uses

Conditional / special use1

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Fencing & walls

Landscaping & trees

  • Minimum vegetated buffer width50 ft

    A vegetated buffer of at least 50 feet in width shall be maintained along all property lines.

Lighting

  • Full cutoff lighting required

    All exterior lighting shall be full cutoff fixtures directed downward to minimize glare onto adjacent properties and roadways.

Other

  • Backup generator testing

    Backup generators shall be equipped with noise suppression devices and shall be tested only during daylight hours, except in the case of an emergency.

  • Construction hours

    Hours of operation for construction activities shall be limited to 7:00 a.m. to 7:00 p.m., Monday through Saturday.

From the ordinance

The maximum height of any data center building shall be 60 feet. The site shall be enclosed by a fence at least six feet in height with a locked gate at all access points. A vegetated buffer of at least 50 feet in width shall be maintained along all property lines.