Page County Unincorporated, Virginia · General provision

§ 125-30.4

Dimensional standards

lot requirementsSTREETSTREETFront 100 ftRear 100 ftSide 100 ftStreet side 100 ft
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Hours of operation

    No sawing, planing, chipping, or other operation, or other processing machinery shall be conducted between 7:00 p.m. and 7:00 a.m. No loading or unloading or processing of wood products shall occur between 12:00 midnight and 7:00 a.m.

Setback

From the ordinance

Each portable or commercial sawmill, chipping mill, or shaving mill shall be subject to the following:
§ 125-30.4