Page County Unincorporated, Virginia · General provision
§ 125-30.4
Dimensional standards
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Hours of operation
No sawing, planing, chipping, or other operation, or other processing machinery shall be conducted between 7:00 p.m. and 7:00 a.m. No loading or unloading or processing of wood products shall occur between 12:00 midnight and 7:00 a.m.
Setback
- Machinery setbackSetbackThe distance a building must be held back from a lot line. from dwellings200 ft
No saw, planer, chipper, conveyor, chute, or other like machinery shall be located closer than 200 feet to any dwelling on other property in the area.
- Structure and storage setbackSetbackThe distance a building must be held back from a lot line. from lot line100 ft
No structure and no storage of lumber, logs, chips, or timber shall be located closer than 100 feet to any lot line.
From the ordinance
Each portable or commercial sawmill, chipping mill, or shaving mill shall be subject to the following: