Page County Unincorporated, Virginia · General provision
§ 125-30.1
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Route-wide special useConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote. application
Special use permit application may cover entire route rather than parcel-by-parcel.
From the ordinance
Applications for special use permits to construct electrical facilities above 40 kilovolts may be made by filing one special use application for the entire route of the transmission line or electrical facility, rather than on a parcel-by-parcel basis.