Orange County Unincorporated, Virginia · General provision

§ 1102.03

Uses

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Building permit required

    Prior to occupancy of the temporary dwelling, the applicant must also obtain a building permit for that dwelling.

  • Maximum total permit period24 months

    may be renewed for additional six-month periods not to exceed a total permit period of 24 months.

  • Temporary permit duration6 months

    Such temporary permit shall be issued for a period not to exceed six months and may be renewed for additional six-month periods not to exceed a total permit period of 24 months.

  • Removal after expiration60 days

    The manufactured home or mobile home shall be removed within 60 days of the expiration date of the temporary zoning permit.

  • Well and septic permit required

    a valid well and septic permit shall, as applicable, be obtained from the state department of health

From the ordinance

In the event of a medical emergency, a manufactured home may be used as temporary housing for immediate family members... in the agricultural (A) district provided the applicant can show a medical need for such housing and obtains a temporary zoning permit...
§ 1102.03