Sec 70-623
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum duration for temporary housing during construction24 months
Such temporary permit shall be issued for a period not to exceed that which is reasonably expected for the construction or installation of the new dwelling, generally not to exceed 12 months. If additional time for construction is needed... may extend such permit for an additional period of time not to exceed a total permit period of 24 months.
- Maximum duration for temporary emergency housing24 months
Such temporary permit shall be issued for a period not to exceed six months and may be renewed for additional six-month periods not to exceed a total permit period of 24 months.
- Maximum duration for medical emergency housing24 months
Such temporary permit shall be issued for a period not to exceed six months and may be renewed for additional six-month periods not to exceed a total permit period of 24 months.
- Removal of temporary dwelling within days after expiration or CO60 days
The manufactured home or mobile home shall be removed within 60 days of the expiration date of the temporary zoning permit or within 60 days of the issuance of a certificate of occupancy
From the ordinance
Temporary housing may be allowed as outlined below: (a) Temporary emergency housing... (b) Temporary use during new construction... (c) Medical emergency housing...