James City County Unincorporated, Virginia · General provision
Sec. 24-111
Dimensional standards
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum use period12 months
The temporary office shall be used for a period not to exceed one year
- Minimum area for temporary office5,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
A minimum area of 5,000 square feet shall be provided for each structure.
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from lot line15 ft
The structure shall not be placed closer than 15 feet to any lot line.
From the ordinance
A minimum area of 5,000 square feet shall be provided for each structure. The structure shall not be placed closer than 15 feet to any lot line. ... The temporary office shall be used for a period not to exceed one year.