Sec. 24-48
Dimensional standards
Lot
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Noise
- Noise limitation
No activity shall cause or permit to be caused any noise which is plainly audible across a property line between the hours of 11:00 p.m. to 7:00 a.m.
Other
- Access on arterial road
The property shall be located on a road that is classified by the Virginia Department of Transportation as an arterial road.
- Maximum number of attendees300 people
The maximum number of attendees for any given event is limited to 300 people.
- SetbackSetbackThe distance a building must be held back from a lot line. for amplified sound areas100 ft
Not less than 100 feet from any property line for any activity area that will include the use of outdoor amplified sound or music.
- SetbackSetbackThe distance a building must be held back from a lot line. from community character corridor right-of-way150 ft
Not less than 150 feet from the edge of the right-of-way for roads that are designated by the comprehensive plan as community character corridors for all development and activity areas related to the event facility.
- SetbackSetbackThe distance a building must be held back from a lot line. from property line75 ft
Not less than 75 feet from any property line for all development and activity areas related to the event facility.
- Temporary tents30 days
Where proposed, temporary tents are allowed for a period not to exceed 30 days.
From the ordinance
The property must be ten or more acres. ... The maximum number of attendees for any given event is limited to 300 people. ... Setback areas shall be: Not less than 75 feet from any property line ... Not less than 150 feet from the edge of the right-of-way for roads that are designated ... as community character corridors ... Not less than 100 feet from any property line for any activity area that will include the use of outdoor amplified sound or music. ... The property shall be located on a road that is classified ... as an arterial road. ... No activity shall cause ... any noise which is plainly audible across a property line between the hours of 11:00 p.m. to 7:00 a.m. ... temporary tents are allowed for a period not to exceed 30 days.