James City County Unincorporated, Virginia · General provision

Sec. 24-23. - Submittal requirements.

Extracted standards

14 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Phase IA archaeological study requirement

    A phase IA archaeological study if the property is identified as being an ultra- or highly-sensitive area on the James City County archaeological assessment

  • Electronic submittal requirement

    all information and plans required under (a)(1), (a)(2) or (a)(3) shall be submitted in an electronic format in accordance with the 'Electronic Submittal Requirements for Legislative Applications' policy

  • Fiscal impact analysis requirement

    A fiscal impact analysis, using the worksheet and assumptions provided by the planning division, when the proposal includes residential dwelling units.

  • A total of 12 copies of the master plan should be submitted along with an application for rezoning or a SUP

  • An inset map at a scale of not less than one inch to one mile showing the property in relation to surrounding roads, subdivision or major landmarks

  • A scale may be used so that the entire parcel can be shown on one piece of paper no larger than 30 inches by 48 inches.

  • The master plan shall be prepared by a licensed surveyor, engineer, architect, landscape architect or planner.

  • Maximum access points per abutting public street1 access point

    No more than one access point on each abutting public street shall be permitted unless specifically approved by the board of supervisors

  • Preliminary natural resource inventory requirement

    A preliminary natural resource inventory if the property is identified as being in any B1, B2, or B3 areas, as defined by the Virginia Department of Conservation and Recreation's Natural Heritage Resources Program

  • Traffic impact analysis level of service threshold

    those projects with an entrance or exit onto a roadway with a level of service 'D' or lower

  • Traffic impact analysis threshold100 weekday peak hour trips

    A traffic impact analysis for all projects that expect to generate 100 or more weekday peak hour trips to and from the site during the hours of operation and/or those projects with an entrance or exit onto a roadway with a level of service 'D' or lower shall be required

  • Waiver of submittal requirements

    the planning director may waive any requirement under (a)(1) or (a)(2) above after finding that such information would not be germane to the application

  • Water and sewer impact study flow threshold15,500 gallons per day

    A water and sewer impact study for all projects with an anticipated average daily flow greater than 15,500 gallons

  • Water and sewer impact study lot threshold50 lots

    and/or for proposed residential projects containing 50 lots or more

From the ordinance

A traffic impact analysis for all projects that expect to generate 100 or more weekday peak hour trips to and from the site during the hours of operation and/or those projects with an entrance or exit onto a roadway with a level of service 'D' or lower shall be required
Sec. 24-23. - Submittal requirements.