Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Building line modification
On lots for which the comprehensive plan proposes a wider right-of-way for an abutting street than currently exists, the following modifications to the building line location shall apply: ... Where a yard or setback requirement exists, that requirement shall be measured from the proposed right-of-way line.
From the ordinance
On lots for which the comprehensive plan proposes a wider right-of-way for an abutting street than currently exists, the following modifications to the building line location shall apply: ... Where a yard or setback requirement exists, that requirement shall be measured from the proposed right-of-way line.