Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- Maximum lot areaMinimum lot areaThe smallest parcel on which the district allows anything to be built. in floodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions.30 pct
No more than 30 percent of the required minimum area of any lot shall be located in a flood plain area
Other
- Maximum lot areaMinimum lot areaThe smallest parcel on which the district allows anything to be built. covered by water30 pct
no part of the area of any lot shall be covered by any body of water except that no more than 30 percent of the required minimum area of any lot may be covered by the waters of a lake, pond, or canal planned and approved as a part of and wholly within the subdivision.
From the ordinance
No more than 30 percent of the required minimum area of any lot shall be located in a flood plain area and no part of the area of any lot shall be covered by any body of water except that no more than 30 percent of the required minimum area of any lot may be covered by the waters of a lake, pond, or canal planned and approved as a part of and wholly within the subdivision.