Sec. 74-993, 74-994, 74-996
Dimensional standards
Servicing
- Geographic extent
- Countywide for poultry processing facilities
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Direct access to Route 13, 45, or 60
All poultry processing facilities shall be located with direct access to Route 13, 45, or 60. Prior to the issuance of any building permit, an entrance permit will be required from the Virginia Department of Transportation (VDOT).
- No structures or parking lots within setbackSetbackThe distance a building must be held back from a lot line.
Within this setback, no structures or parking lots are allowed.
- SetbackSetbackThe distance a building must be held back from a lot line. from properties with existing dwellings not owned by processor300 ft
Each poultry processing facility shall be set back from all properties with existing dwellings not owned by the processor a distance of 300 feet.
- SetbackSetbackThe distance a building must be held back from a lot line. from property lines300 ft
The setback for poultry processing facilities from property lines shall be 300 feet.
- Vegetative buffer within setbackSetbackThe distance a building must be held back from a lot line.100 ft
Additionally, within this setback, a vegetative buffer of 100 feet is required. The buffer may be comprised of an existing, well established natural area with extensive tree cover, or may consist of five staggered rows of planted evergreens, with a minimum of one evergreen per 30 lineal feet in each row. The buffer shall be provided in the 100 feet of the setback closest to the adjacent residence.
From the ordinance
Each poultry processing facility shall be set back from all properties with existing dwellings not owned by the processor a distance of 300 feet. Within this setback, no structures or parking lots are allowed. Additionally, within this setback, a vegetative buffer of 100 feet is required. ... The setback for poultry processing facilities from property lines shall be 300 feet. ... All poultry processing facilities shall be located with direct access to Route 13, 45, or 60.