Craig County Unincorporated, Virginia · General provision
Sec. 58-600(e)(2)
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Solar agriculturalAgricultureRaising crops or livestock, generally including the structures that serve them. generator buffer distance75 ft
All equipment should be buffered from adjoining properties by a minimum distance of 75 feet
- Solar agriculturalAgricultureRaising crops or livestock, generally including the structures that serve them. generator max land use25 pct
cannot use more than 25 percent of contiguous land for solar generation.
- Solar agriculturalAgricultureRaising crops or livestock, generally including the structures that serve them. generator max capacity1.5 MW
Solar agricultural generator installations cannot exceed 1.5 megawatts
- Solar agriculturalAgricultureRaising crops or livestock, generally including the structures that serve them. generator replacement tree heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.5 ft
Trees removed from the buffer shall be replaced by planting a similar tree in the buffer at least five feet in height at the time of planting.
- Solar agriculturalAgricultureRaising crops or livestock, generally including the structures that serve them. generator vegetative screen
Solar agricultural generator installations should be buffered from structures on adjoining parcels by a vegetative screen at least equal to the height of the installation.
From the ordinance
Solar agricultural generator installations cannot exceed 1.5 megawatts and cannot use more than 25 percent of contiguous land for solar generation.