Craig County Unincorporated, Virginia · District

M-1

Industrial District

Dimensional standards

M-1 lot requirementsSTREETSTREETFront 150 ftRear 150 ftSide 150 ftStreet side 150 ftMAX HEIGHT20 ft
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Conditional / special use1

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Fencing & walls

Height

Landscaping & trees

  • Minimum vegetative buffer width150 ft

    A vegetative buffer sufficient to mitigate the visual impact of the facility is required. The buffer must consist of a landscaping strip at least 150 feet wide, located within the required setbacks and shall run around the entire perimeter of the project area.

Other

From the ordinance

Utility scale solar installations shall be allowed solely by conditional use permit in the M-1 district. ... All ground-mounted minor and utility-scale solar energy facilities shall be set back at least 150 feet from all abutting public rights-of-way and from adjacent property lines. ... Utility scale solar installations may not exceed a height of 20 feet.
Sec. 58-600(g)