Article 21, Section 21-5
Extracted standards
10 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Construction sign maximum area16 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Construction signs are permitted ... to a maximum area of 16 square feet for each firm.
- Construction sign removal after completion14 days
The signs shall be confined to the site of the construction projects and shall be removed within 14 days after the completion of the project.
- Election sign removal after election30 days
All signs involving an election or its candidates are exempt, but they shall be removed within 30 days after the election for which they were made.
- Grand opening banner maximum area40 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Such banner shall not exceed 40 square feet.
- Grand opening banner removal30 days
Such banners shall be removed within 30 days concluding the grand opening.
- New business banner duration30 days
The duration of such permit shall not exceed 30 days
- New business banner maximum area32 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Banners when used in conjunction with the opening of a new business ... shall not exceed 32 square feet.
- Street banners require approval
Street banners, advertising a public entertainment or event, are permitted if specifically approved by the zoning administrator
- Temporary sign removal after activity14 days
Temporary signs as defined in article 1 of this ordinance, but they shall be removed within 14 days after the activity for which they advertise has taken place.
- Window sign maximum percent of window area25 pct
such signs shall not occupy more than 25 percent of the total area of the window
From the ordinance
The following signs shall be permitted anywhere within the county and shall not require a permit: