Brunswick County Unincorporated, Virginia · General provision

1-10-4

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Permit duration

    A temporary permit is issued for a period of 12 months only upon showing by the applicant of a valid and approved building permit for a conventionally built residence or church or a commercial, industrial or public structure or development, public facility or public utility. Such temporary permit may be renewed two times for a period of 12 months each for a maximum of 36 months upon the applicant demonstrating that substantial progress is being made in the construction of the conventionally built residence or church or a commercial, industrial or public facility or utility.

From the ordinance

A temporary permit is issued for a period of 12 months only upon showing by the applicant of a valid and approved building permit for a conventionally built residence or church or a commercial, industrial or public structure or development, public facility or public utility. Such temporary permit may be renewed two times for a period of 12 months each for a maximum of 36 months...
1-10-4