Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum curb cutGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. width40 ft
All curb openings, whether on a corner lot or not, shall not exceed 40 feet in width at the curbline and 30 feet at the property line.
- Minimum distance between driveways40 ft
There shall be a minimum of 40 feet measured along the curbline between any two successive driveways.
- Minimum distance from building to public/semipublic property100 ft
and no part of any such automobile filling station, garage, or shop shall be within 100 feet of any of the said public, semipublic, or institutional buildings or properties.
- Minimum distance from school, churchReligious facilityA building used for organised worship, often with halls and schools attached., hospital, etc.400 ft
No automobile filling station, public garage, or automobile repair shop shall have a vehicular entrance or exit within 400 feet along the same side of a street and in the same block, of the premises of any school, public playground, church, hospital, public library, or institution for children or dependents
- Oil draining pit setbackSetbackThe distance a building must be held back from a lot line.12 ft
No automobile filling station or public garage shall be permitted where any oil draining pit or visible appliance for any such purpose, other than filling caps, is located within 12 feet of any street lot line or within 25 feet of an R district
From the ordinance
No automobile filling station, public garage, or automobile repair shop shall have a vehicular entrance or exit within 400 feet along the same side of a street... no part of any such automobile filling station, garage, or shop shall be within 100 feet of any of the said public, semipublic, or institutional buildings or properties.