Sec. 22-153 through 22-167
Dimensional standards
Lot
Density
Height & bulk
Housing
- Two-family
- by_right
- Three-family
- by_right
- Four-plus family
- by_right
Uses
Permitted by right18
Conditional / special use5
Accessory1
Prohibited3
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Buffer space along perimeter
Buffer space along the perimeter of a planned residential development district shall be in substantial compliance with yard and setback standards applicable in other zoning districts in which comparable land uses are commonly found.
- Minimum project area50 acresacre43,560 square feet — about the size of an American football field without the end zones.
The gross area of the tract of land to be developed under the planned residential district shall be 50 contiguous acres.
- Transitional yardYardThe open space left between a building and its lot line — the space a setback creates. depth for nonresidential uses10 ft
Whenever any nonresidential use is established in this district on a lot shown or proposed within the site plan which adjoins any other lot shown or proposed to be residentially developed within the site plan within the planned residential development district, a transitional yard shall be provided on such lot by the nonresidential use along such common boundary to a depth of ten feet.
- Underground utilities required
Underground utilities, including telephone and electrical systems, are required within the limits of all planned residential developments.
From the ordinance
Any density up to and including eight dwelling units per acre may be applied for in a PRD district