18 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Lighting

  • Lighting shielding required

    All outdoor lighting shall be shielded to direct light and glare onto the system's premises.

Noise

  • Maximum inverter noise50 dBA

    Inverter noise shall not exceed fifty (50) dBA, measured at the facility property line.

Other

  • Surety or bond required

    Surety or a bond posted prior to obtaining a land disturbance permit for the duration of the project.

  • A vegetative buffer yard shall be required. The vegetative buffer yard shall meet one (1) or more of the following set of requirements: a. Forty (40) feet wide with: - Four (4) canopy trees per one hundred (100) linear feet. - Six (6) understory trees per one hundred (100) linear feet. - Eleven (11) evergreen trees per one hundred (100) linear feet.

  • Canopy trees per 100 linear feet4 trees/100ft

    Four (4) canopy trees per one hundred (100) linear feet.

  • Change of ownership/operator notice required

    The owner and operator shall provide a written notice to the County Administrator and Zoning Administrator in the event of any change in ownership, change in the operator, inactivity, or modifications to equipment or activities on site, excluding general maintenance.

  • Decommissioning plan required

    A decommissioning plan shall be prepared by the professional engineer and shall include the following: a. The anticipated life of the project; b. The estimated decommissioning cost and how such cost is determined; c. The manner in which it is to be decommissioned; and d. Surety or a bond posted prior to obtaining a land disturbance permit for the duration of the project.

  • Evergreen trees per 100 linear feet11 trees/100ft

    Eleven (11) evergreen trees per one hundred (100) linear feet.

  • FAA compliance distance5 nautical miles

    Any solar facilities located within five (5) nautical miles of any airport shall meet all FAA requirements.

  • Fire Suppression Plan required

    Prior to generation of power, a Fire Suppression Plan shall be approved by the Cumberland County Fire Marshall, Director of Cumberland Fire & EMS, and the Cumberland County Building Official.

  • Glare restriction

    The solar facility shall be installed so that no reflected glare is visible at the property line adjacent to a public road.

  • Groundcover requirement

    Native grasses or any non-invasive species shall be used to stabilize the site for the duration of the facility's use.

  • Inspection access allowed

    The County Administrator, Building Official, or Zoning Administrator, or any other parties designated by those County officials, shall be allowed to enter the property at any reasonable time with reasonable notice to check for compliance with the provisions of this permit.

  • Liability insurance required

    The applicant shall provide proof of adequate liability insurance for a solar facility prior to the issuance of a zoning or building permit.

  • Removal timeline after cessation12 months

    The system owner and the owner of the land on which the solar facility is located shall be responsible and liable, jointly and severally, to begin removing all obsolete or unused systems, facilities and equipment within six (6) months of cessation of operation and shall have them fully removed within twelve (12) months.

  • Understory trees per 100 linear feet6 trees/100ft

    Six (6) understory trees per one hundred (100) linear feet.

  • Wetland avoidance required

    Wetlands shall be inventoried, delineated, and avoided.

Signage

From the ordinance

No signage is allowed on the solar facility fencing except for a sign, not to exceed thirty-two (32) square feet...
Ord. No. 23-02, 9-12-2023