Cumberland County Unincorporated, Virginia · General provision

Sec. 74-746 to 74-747

Dimensional standards

lot requirementsSTREETFront 100 ftRear 50 ftSide 50 ftMAX HEIGHT15 ft
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Conditional / special use1

Extracted standards

10 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Fencing & walls

Noise

  • Maximum inverter noise50 dBA

    Inverter noise shall not exceed fifty (50) dBA, measured at the facility property line.

Other

  • Canopy trees per 100 linear feet4 trees/100ft

    Four (4) canopy trees per one hundred (100) linear feet.

  • Decommissioning completion12 months

    And shall have them fully removed within twelve (12) months.

  • Decommissioning start after cessation6 months

    The system owner and the owner of the land on which the solar facility is located shall be responsible and liable, jointly and severally, to begin removing all obsolete or unused systems, facilities and equipment within six (6) months of cessation of operation.

  • Evergreen trees per 100 linear feet11 trees/100ft

    Eleven (11) evergreen trees per one hundred (100) linear feet.

  • At least one hundred (100) feet from the nearest inhabitant residence at the time of the initial application.

  • Understory trees per 100 linear feet6 trees/100ft

    Six (6) understory trees per one hundred (100) linear feet.

  • Vegetative buffer width40 ft

    A vegetative buffer yard shall be required. The vegetative buffer yard shall meet one (1) or more of the following set of requirements: a. Forty (40) feet wide with ...

Signage

From the ordinance

All solar energy facilities shall be subject to the following standards: ...