Sec. 74-702
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Time limit for commencement3 years
Construction or operation shall be commenced within one (1) year after applicants receipt of all necessary federal, state, and local permits, but no later than three (3) years after the date of conditional use approval, or the use permit becomes void.
- Discontinuance voids permit1 year
If after a use permit has been issued and the use for which the use permit was obtained is discontinued for more than one (1) year, the use permit becomes void.
- Reapplication waiting period360 days
No application for a use permit for the same lot shall be considered by the Board of Supervisors within a period of three hundred sixty (360) days from its last consideration.
- General conditional useConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote. review criteria
That the establishment, maintenance or operation of the conditional use will not be detrimental to or endanger the public health, safety, morals, comfort or general welfare; ... (14 criteria)
From the ordinance
The following standards shall be used as guidelines by the planning commission and board in acting upon conditional use applications: ...