Amelia County Unincorporated, Virginia · General provision

§ 325-34.2

Dimensional standards

Servicing

Applies near
high-voltage transmission line, village development area
Applies within
5,280 ft
Geographic extent
Utility-scale solar must be within 1 mile of a high-voltage transmission line and not within 1 mile of a village development area.

Uses

Extracted standards

24 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Density

  • Maximum percentage of land area for utility-scale solar in 5-mile radius3 pct

    No more than 3% of the land area in any given five-mile radius shall be approved for use as the project area for utility-scale solar energy systems.

Fencing & walls

  • Minimum opacity of screening fence75 pct

    Fencing intended for screening shall be at least 75% visually solid

Height

Lighting

  • Lighting direction

    All construction lighting shall be downward facing.

Noise

  • Maximum noise level at property line50 dbA

    noise levels measured at the property line shall not exceed 50 dbA

Other

  • Berm required around battery storage

    All battery storage facilities shall be completely surrounded by a berm

  • four to six feet above the adjacent grade

  • Berm side slope ratio3 ratio

    Berms shall generally be constructed with a 3:1 side slope to rise ratio

  • Berm top width3 ft

    with a three-foot-wide top

  • Decommissioning cost guarantee required

    The full estimated decommissioning cost shall be guaranteed by escrow at a federally insured financial institution, irrevocable letter of credit, or surety bond before a building permit is issued

  • Decommissioning plan required

    Applications for utility-scale solar energy systems shall include a decommissioning plan

  • Time to complete decommissioning12 months

    The facility owner/operator shall have 12 months to complete decommissioning of the solar energy system.

  • Maximum distance from high-voltage transmission line5,280 ft

    Utility-scale solar energy systems shall be located within one mile of a high-voltage transmission line (HVTL).

  • Minimum setbackSetbackThe distance a building must be held back from a lot line. for battery storage from public roads and property lines5,000 ft

    All battery storage facilities shall maintain a minimum of 5,000-foot setback from all public roads and property lines

  • the Board of Supervisors may approve through the special exception permit conditions that allow a battery storage facility to locate closer than 5,000 feet, but no closer than 1,000 feet from public roads and property lines

  • Minimum buffer width when using existing wetlands/woodlands150 ft

    The wetlands or woodlands shall be permanently protected as a designated buffer and the overall buffer shall measure at least 150 feet.

  • Minimum distance from village development area5,280 ft

    No utility-scale solar energy system shall be located within one mile of a village development area.

  • Minimum setbackSetbackThe distance a building must be held back from a lot line. from property lines and public rights-of-way500 ft

    Generally, all solar energy facilities shall be located a minimum of 500 feet to 1,000 feet from adjoining property lines and public rights-of-way.

  • Minimum setbackSetbackThe distance a building must be held back from a lot line. from occupied residential dwelling1,000 ft

    No utility-scale solar energy facilities shall be installed within 1,000 feet of any residential dwelling that is occupied at the time the special exception permit is approved.

  • Minimum width of vegetative screening strip50 ft

    In the event existing vegetation or landforms providing the screening are inadequate or disturbed, new plantings shall be provided in a landscaped strip at least 50 feet wide.

  • Trees intended for screening shall consist of a combination of evergreen and deciduous trees that are five to six feet in height at time of planting.

  • Spacing of screening trees15 ft

    A triple row of trees shall be placed on average at 15 feet on center.

Signage

  • Warning signage required

    Appropriate warning signage and a 911 address sign shall be posted in a clearly visible manner.

From the ordinance

Utility-scale solar energy systems shall be considered as a principal use. ... No utility-scale solar energy system shall be located within one mile of a village development area. Utility-scale solar energy systems shall be located within one mile of a high-voltage transmission line (HVTL).
§ 325-34.2