Amelia County Unincorporated, Virginia · General provision

Article XXIIIA, § 325-23A.3

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • The minimum setbacks for animal manure/waste storage site operations shall be established as follows: [table]

  • Contiguous parcels under same ownership treated as one

    Notwithstanding Subsection B, contiguous parcels under the same ownership and subject to the same zoning classification shall be treated as one parcel for the purposes of compliance with required setbacks.

  • No animal manure/waste storage site authorized under this chapter shall continue in operation if, after meeting the requirements of this chapter, land is subsequently divided from the parcel on which the site is located, such that the setback requirements no longer conform to this chapter.

From the ordinance

The minimum setbacks for animal manure/waste storage site operations shall be established as follows: [table]
Article XXIIIA, § 325-23A.3