Plumas County Unincorporated, California · General provision

Sec. 9-2.4208

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Irrigation operation outside allowed watering period

    Operation of irrigation systems outside of the allowed watering period is permitted for auditing and system maintenance.

  • Required maintenance activities

    A maintenance schedule shall include, but not be limited to: routine inspection, auditing, adjustment and repair of irrigation system, aerating and dethatching turf, weeding, fertilizing, pruning, removing obstructions from emissions devices, top dressing with compost, replenishing mulch.

  • Landscape maintenance schedule required

    Landscapes shall be maintained to ensure water efficiency. A regular maintenance schedule shall be submitted with the certificate of completion.

  • Repair components efficiency

    Repair of all irrigation equipment shall be done with the originally installed components, their equivalents, or with components with greater efficiency.

  • Sustainable best practices encouraged

    A project applicant is encouraged to implement established landscape industry sustainable best practices for all landscape maintenance activities.

From the ordinance

Landscapes shall be maintained to ensure water efficiency. A regular maintenance schedule shall be submitted with the certificate of completion.
Sec. 9-2.4208