which may include the use of excavators, loaders, conveyor systems, and hauling vehicles. ** QUARRY OPERATION ** The processing and/or storing of extracted stone, sand, or gravel that does not transform the initial chemical composition of the extracted
Read it in the chapter →Land use · Page County Unincorporated, Virginia
quarry operations
Named in 1 of this ordinance’s zoning districts.
How this ordinance defines it
The operative definition is the local one. Codes routinely subdivide a category into tiers — “day care 2, family”, “group home 2” — and attach different permissions to each, so only Page County Unincorporated’s own text settles what this covers.
outdoor shooting ranges. (18) Commercial parking facilities. (19) Riding stables or academies. (20) Quarry operations pursuant to § 125-30.23. **E.** Minimum lot size shall be as follows: area: 1 3/4 acres; width at setback line: 150
Read it in the chapter →a maximum of 15 beehives per residential lot or parcel. # § 125-30.23 Quarry operations . [Added 7-15-2024] A. Quarry operations as defined in § 125-4 shall be subject to the following application and design requirements. These
Read it in the chapter →