County (unincorporated) · Virginia

Frederick County Unincorporated

The ordinance has been retrieved, read and turned into structured rules.
1
Districts
404
Extracted rules
1,895
Standards
12
Chapters read

Zoning districts

1 districts, grouped by category.

General provisions

403 rules that bind every district rather than one — sign regulations, parking, floodplain and the rest of the code’s citywide chapters.

§ 165-204.391 standards

Retail stores (drug, health, and personal care) located in the B1 (Neighborhood Business) District shall meet the following requirements:

§ 165-204.391 standards

Retail store size limit.

§ 165-204.391 standards

Retail stores (drug, health, and personal care) located in the B1 (Neighborhood Business) District shall meet the following requirements: ...

§ 165-204.402 standards

Where allowed, facilities shall have an approved site plan meeting the following conditions: A. All principal activities shall take place entirely within an enclosed structure. B. All outdoor facilities shall be incidental to the principal facility or activity. C. No facility or activity shall be erected or conducted less than 30 feet from any residential district or area within other districts which are predominantly residential in nature.

§ 165-204.403 standards

Where allowed, facilities shall have an approved site plan meeting the following conditions:

§ 165-204.403 standards

Where allowed, facilities shall have an approved site plan meeting the following conditions: ...

§ 165-204.416 standards

All data centers must meet the following requirements: A. Prior to the approval of a rezoning application or conditional use permit, the following shall be provided: 1. A site assessment to examine the sound profile of the data center on residential units and schools located within 500 feet of the data center property boundary in accordance with Subsection E. 2. A site assessment evaluating the effect of the proposed facility on: (i) ground and surface water resources; (ii) agricultural resources; (iii) parks; (iv) registered historic sites; and (v) forestland on the data center site or immediately contiguous land. 3. Details of any new or existing substations that will be used to serve the data center and the anticipated transmission voltage required to serve the data center. B. Generator testing and cycling shall be limited to weekdays (Monday to Friday) between the hours of 8:00 a.m. to 5:00 p.m. Notwithstanding the foregoing, all noise generated by any on-site generator shall comply with County Code § 165-201.12. C. Mechanical equipment. 1. Location. Ground-mounted mechanical equipment shall be prohibited in the primary setback. 2. Screening. Ground-mounted and rooftop mechanical equipment shall be screened from public roadways and adjoining properties on all sides. a. Generators. All generators shall be enclosed with a manufacturer-approved enclosure or located within the primary structure. b. Other mechanical equipment. An opaque screen shall be provided by either the principal building, louvered wall, or equivalent screen approved by the Zoning Administrator. The maximum height of the opaque screen should correspond to the tallest piece of equipment being shielded from view. D. Setback and screening requirements. 1. Structures must be set back at least 200 feet from the common property line when adjoining land is zoned RA, RP, R4, R5 and MH1. Otherwise, the base zoning district dimensional standards shall apply. 2. A category C full-screen-type buffer shall be provided around the perimeter of the property. If the adjoining property is zoned B3, TM, M1, or M2, no buffer is required. E. Noise and noise monitoring. 1. The applicant shall submit an Environmental Noise Impact Assessment prepared by a qualified full member of the Acoustical Society of America (ASA), a member of the Institute of Noise Control Engineering (INCE), or a member of the National Association of Acoustical Consultants (NCAC). The purpose of such noise impact assessment, modeled in SoundPLAN, CadnaA, or accepted equivalent, shall model anticipated noise levels as a result of facility operation and establish a baseline noise level prior to approval of a rezoning or conditional use permit. 2. A noise study certifying noise levels shall be conducted 12 months after the issuance of the first certificate of occupancy (CO) and every five years thereafter. Each noise study shall be submitted for review to the Zoning Administrator and/or his/her designee to assess the actual impact of the completed project. a. The measurement of sound or noise pursuant to this section shall be as follows: 1. The measurement of sound or noise shall be made with a Type 1 or Type 2 sound level meter which meet the standards prescribed in ANSI S1.4:2014, Specification for Sound Level Meters. The instruments shall be maintained in calibration and good working order. A minimum of three sound level readings shall be taken. The average of these readings will be used as the average sound level. If the background noise is equal to the levels set forth in this section, 3 dB shall be subtracted out of the average sound level. 2. The slow meter response of the sound level meter shall be used to determine that the average amplitude has not exceeded the dBA readings or the limiting noise spectra set forth in this section. 3. Unless otherwise specified, the measurement shall be taken at the property boundary on which such noise is generated. b. Any additions, alterations, or expansion of a facility or its equipment shall require a new noise impact assessment to be submitted and approved by the Zoning Administrator. c. If the post construction noise study exceeds the maximum noise level permitted, additional noise mitigation strategies, improvements, or operational changes shall be required. 3. Any equipment necessary for cooling, ventilating, or otherwise operating the facility, including power generators or other power supply equipment on the property, whether ground-mounted or roof-mounted, shall include the following noise-mitigation elements: a. Low-noise emission fans. b. Acoustic wraps for compressors and oil separators. c. An acoustic perimeter, which may include a perimeter around a group of individual chillers, which may be louvered or solid. d. Other sound-attenuation measures as approved by the Zoning Administrator. The owner shall provide documentation, in the form of technical specifications, photographs, and/or engineered plans, of the above mitigation measures contained in Subsection E(3) with each building permit for a data center building on the property and shall further provide documentation that such measures have been installed concurrently with each occupancy.

§ 165-204.4110 standards

All data centers must meet the following requirements:

§ 165-204.4110 standards

All data centers must meet the following requirements: ...

§ 165-204.423 standards

Backyard chickens and coops located in the R4 (Residential Planned Community) and R5 (Residential Recreational Community) Zoning Districts shall meet the following requirements: A. Roosters and other species of fowl are prohibited. B. Chickens shall be permitted accessory to single-family detached residences only. A maximum of six chickens (hens only) shall be permitted with one single-family detached residence. C. Chicken coops and pens shall meet the setbacks for accessory structures in the RP (Residential Performance) Zoning District contained in § 165-402.09M and shall not be placed in the front setback yard required for the primary use per § 165-201.02E. D. Chickens shall not run at large in accordance with § 48-26 (animals and fowl running at large). E. Chicken waste shall be stored in an enclosed container and properly disposed of by composting or other means to not create a nuisance. F. Chicken feed shall be stored in an enclosed, vermin-proof container.

§ 165-204.426 standards

Backyard chickens and coops located in the R4 (Residential Planned Community) and R5 (Residential Recreational Community) Zoning Districts shall meet the following requirements:

§ 165-204.422 standards

Backyard chicken regulations.

§ 165-204.426 standards

Backyard chickens and coops located in the R4 (Residential Planned Community) and R5 (Residential Recreational Community) Zoning Districts shall meet the following requirements: ...

§ 165-204.426 standards

Backyard chickens and coops located in the R4 (Residential Planned Community) and R5 (Residential Recreational Community) Zoning Districts shall meet the following requirements: ...

§ 165-204.42 and § 165-201.05B(2)3 standards

Backyard chicken regulations and accessory dwelling attachment requirement.

§ 165-302.03D, § 165-303.02B1 standards

For the purposes of the transfer of development rights program only, sending sites zoned RA (Rural Areas) shall have a base density of one dwelling unit per five acres for transfer purposes. All subdivisions for receiving properties zoned RA (Rural Areas) utilizing development rights shall be subject to the same requirements as property zoned RP (Residential Performance) and shall not qualify for the standards specified in § 144-31.

§ 165-502.02 - 165-502.0619 standards

The intention of the Residential Recreational Community District is to provide for a carefully planned recreational community... All land to be contained within the Residential Recreational Community District shall be included within an approved master development plan.

§ 165-504.01 - 165-504.0720 standards

The MS (Medical Support) District is intended to provide for areas to support hospitals, medical centers, medical offices, clinics, and schools of medicine.

§ 165-701.026 standards

In order to carry out the provisions of this district, zones are established which include all of the land and airspace of Frederick County with elevations equal to and above the approach surfaces, transitional surfaces, horizontal surfaces and conical surfaces as they apply to the Winchester Regional Airport.

§ 165-702.024 standards

These provisions shall apply to all privately and publicly owned lands within the jurisdiction of Frederick County and identified as areas of special flood hazard according to the Flood Insurance Rate Map (FIRM) or included in the Flood Insurance Study (FIS) that are provided to Frederick County by FEMA.

Source documents

The chapters of the adopted code that were retrieved, read and extracted from. Everything above traces back to one of these.