Land use · Botetourt County Unincorporated, Virginia

manufacturing

Named in 2 of this ordinance’s zoning districts.

How this ordinance defines it

The operative definition is the local one. Codes routinely subdivide a category into tiers — “day care 2, family”, “group home 2” — and attach different permissions to each, so only Botetourt County Unincorporated’s own text settles what this covers.

| | Planned Industrial Park District | PIP | | Research and Advanced Manufacturing | RAM | **Overlay districts:** - Flood Hazard Overlay District. (Res. of 1-1-02, Div. 600; Res. No. 16-05-14, 5-24-16; Res. No.

Read it in the chapter →

residential subdivisions in the A-1 or RR districts. ### (c) Indoor/outdoor operations. All manufacturing operations must take place within a completely enclosed building, unless permission for outside operations is specifically granted by the board of

Read it in the chapter →

sites by the construction of facilities for servicing the lots on which the manufacturing homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the

Read it in the chapter →

single family attached) | | Assembly of electrical or electronic devices | (see manufacturing ) | | Automobile graveyard | 1.0 per employee on the largest shift, plus 1.0 per 10,000 sq. ft. of storage area

Read it in the chapter →

mentally or developmentally disabled persons living in a residential group home facility. **Fertilizer manufacturing :** The manufacture of fertilizer for farm and garden application; may include composting facilities. **Fitness center (and health):** An establishment that provides

Read it in the chapter →

Where it is allowed here

Permitted by right2

Allowed outright — no hearing needed.