Municipality · Colorado

Commerce City

This locality is on the roster but its ordinance has not been retrieved yet.
25
Districts
153
Extracted rules
885
Standards
12
Chapters read

Zoning districts

25 districts, grouped by category.

General provisions

128 rules that bind every district rather than one — sign regulations, parking, floodplain and the rest of the code’s citywide chapters.

Article III, Subdivisions50 standards

All subdivisions shall conform to the requirements of this land development code and the standards contained within this code.

Article XXI, Sec. 21-5520, 21-5530, 21-55403 standards

If a nonconforming use is discontinued for a period of 180 days or more, any future use of the land shall conform to the standards of the district in which it is located.

Brewpub and Tasting Room3 standards

Not more than 30 percent of the gross floor area of a brewpub shall be used for the production of beer.

Division 2, Short-Term Rentals7 standards

In zone districts, where permitted, short-term rentals shall be clearly incidental and subordinate to the principal use of a single-family detached or single-family attached dwelling unit on the lot on which the short-term rental is located.

General1 standards

All open off-street parking areas, drives, and storage lots, except parking lots and garages accessory to a single family detached or attached dwelling, shall provide a six-inch concrete curb around the entire perimeter.

General provisions1 standards

The Floor Area Ratio requirements shall only apply to new structures.

Preamble (before Sec. 21-3300)1 standards

If a PUD zone document references design guidelines for the PUD, no PUD permit shall be approved until the design guidelines are finalized and on file with the city.

Sec. 10.11(12)

Areas zoned industrial — Ten (10) years.

Sec. 10.11(12)

Areas zoned commercial — Five (5) years.

Sec. 10.11(12)

Areas zoned agricultural — Five (5) years.

Sec. 10.11(12)

Areas zoned residential — Two (2) years.

Sec. 10.11(12)

Other zoned areas, if any — Two (2) years.

Sec. 21-3214 and Sec. 21-32524 standards

A PUD development permit shall lapse and be of no further force and effect if a building permit application ... has not been submitted within ... two years of the date of approval.

Sec. 21-32151 standards

In cases where the applicant requests that the Floor Area Ratio be reduced to zero: a. The property must be 5 acres or more in size;

Sec. 21-32171 standards

A decision on a temporary use permit shall be issued no later than 30 days from the date a completed application is received by the city.

Sec. 21-32192 standards

The subject property is not located in any floodplain. The area of land disturbance must not be exposed for more than 60 consecutive days without temporary or permanent stabilization.

Sec. 21-32201 standards

A height exception shall lapse unless a building permit is issued and construction is substantially completed within three years from the date of approval.

Sec. 21-32213 standards

a use-by-permit shall lapse unless a building permit has been issued and construction diligently pursued within two years of approval. In the event no new structure is required to operate the use, then the use-by-permit shall lapse if the use is not commenced within 180 days of the approval. In addition, a use-by-permit shall automatically lapse and have no further effect if the use is discontinued for 180 consecutive days.

Sec. 21-32221 standards

A variance shall lapse and have no further effect unless construction has been completed within one year from the date the variance is granted.

Sec. 21-32301 standards

if after it is commenced, it is abandoned or discontinued for a period of 180 days or more, then the conditional use permit shall automatically lapse and be null and void.

Source documents

The chapters of the adopted code that were retrieved, read and extracted from. Everything above traces back to one of these.