Santa Paula, California · District

OPR

Open Space Parks and Recreation
Open spaceParks RecreationAll Santa Paula districts0

Dimensional standards

OPR lot requirementsSTREETSTREETFront 20 ftRear 20 ftSide 20 ftStreet side 20 ftMin width 100 ftMIN LOT AREA1 acMAX HEIGHT35 ft / 2.5 storiesMAX LOT COVERAGE10%MAX IMPERVIOUS10%
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Maximum building coverage5 pct

    All main buildings, accessory buildings and other structures must cover not more than 5% of the site.

  • Temporary Use Permit required

    One-time or annually occurring events such as arts and craft shows and exhibits, carnivals, circuses, fairs, seasonal outdoor sales, and farmers' markets require a Temporary Use Permit.

From the ordinance

Minimum Lot Size 1 acre; Minimum Lot Width 100 ft.; Setbacks 20 ft.; Maximum Lot Coverage 10% total; Building Height 2-1/2 stories or 35 ft.
16.09.020 and 16.09.030