Dimensional standards

CBD lot requirementsSTREETSTREETbuildable areaFront 0 ftRear 0 ftSide 0 ftStreet side 0 ftMAX HEIGHT45 ft / 3 storiesMAX LOT COVERAGE100%MAX FAR2
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Extracted standards

7 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Design

  • Architectural projection3 ft

    Architectural features may project up to three feet beyond the property or right-of-way line, provided such projection is a minimum of eight feet above ground.

  • Awning projection8 ft

    Awnings may project up to eight feet beyond the property or right-of-way line, provided such projection is a minimum of 12 feet above ground.

  • Either the first floor or the second floor must be built to and parallel with the front property line.

  • Design guidelines

    All development must comply with the Design Guidelines for Downtown Santa Paula.

  • Zero lot line on Main Street

    Zero Lot Line on Main Street between 7th Street and 12th Street.

Other

  • Minimum landscape coverage10 pct

    CBD: Zero-lot-line: 0%, All other: 10%

  • Mechanical/electrical screening

    All mechanical/electrical equipment and satellite dish antennae must be screened by architectural treatments compatible with the architecture of the building.

From the ordinance

CBD: FAR 2.0, front 0ft (or 10ft if across from residential), side 0ft, rear 0ft, height 3 stories/45ft, lot coverage 100%, landscaping 10% (0% zero-lot-line). Zero lot line on Main Street.