Sacramento, California · District

M-T

M-T zone

Dimensional standards

M-T lot requirementsSTREETSTREETbuildable areaFront 0 ftRear 0 ftSide 0 ftStreet side 0 ftMAX HEIGHT70 ft
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Extracted standards

11 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Design

Lighting

  • Minimum pedestrian lighting0.25 fc

    Pedestrian-oriented lighting must be provided along all street-facing facades and walkways with a minimum illumination of ¼ foot-candles from one-half hour before dusk to one-half hour after dawn.

Other

Setback

From the ordinance

The M-T zone permits commercial and industrial uses near light rail stations, with a maximum height of 70 feet and no minimum setbacks except when abutting R- or OB-zoned lots.
17.220.710-17.220.760