Mountain House, California · General provision

Chapter 9-8-19, Sections 9-8-1901 to 9-8-1910

Extracted standards

26 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Density

  • Density Range

    A Major Subdivision Application in which the subdivision exceeds or falls below the density range for any given land use designation specified by the Mountain House Master Plan may be approved, provided the density of development for said land use designation is within the General Plan density range and the Mountain House Master Plan density range for that land use district will be maintained for the neighborhood.

Other

  • Appeals30 days

    Appeals of any Planning Commission decision shall be heard by the City Council within thirty (30) calendar days, or any mutually agreed upon extension thereof, after the date of filing the appeal.

  • Canal Report2,640 ft

    Canal Report, evaluating the safety of open canals within one-half (½) mile of the boundaries of the proposed subdivision

  • Conceptual Site Design Plan

    Conceptual Site Design Plan, showing sidewalks, driveways, pathways, off-street parking, building footprints, setbacks and building coverage, landscaping, and internal circulation (for nonresidential uses), for each specific land use type

  • Cultural Resources Report

    Cultural Resources Report, specifying the method of preserving significant architectural and/or historic cultural resources within the boundaries of the proposed subdivision

  • Expiration Date36 months

    A Major Subdivision Application which has been approved shall expire thirty-six (36) months after the date of its approval, unless otherwise specified in this Title.

  • Farm Irrigation Drainage Report

    Farm Irrigation Drainage Report, consisting of a map of existing farm drains that traverse the proposed subdivision, identified by type, location and function; an analysis of the impacts of the proposed subdivision on the existing farm irrigation drainage system; a determination of the planned dispossession of the system, including the abandonment of specific pipes and drains; a determination of whether the farm irrigation drainage system could be integrated into the storm system for the proposed subdivision; and an estimate of the costs associated with reconstructing or rerouting irrigation waters caused by the proposed subdivision.

  • Fencing and Edge Treatment Plan

    Fencing and Edge Treatment Plan, showing community walls and community edge treatments and including community edge buffers

  • Neighborhood Center Special Purpose Plan

    Neighborhood Center Special Purpose Plan, if applicable, with illustrative drawings and map of the Neighborhood Center showing land use and building types (including child care centers), sidewalks, driveways, pathways, internal circulation, off-street parking, building footprints, setbacks, building coverage, landscaping, recreational uses, activity areas, and transit stops; and including related documents, specifically, the School Facilities Plan, the Neighborhood Park Plan, and Joint Powers Agreement for joint use of school and park facilities.

  • Nesting Site Survey

    Nesting Site Survey, consisting of a survey conducted by a qualified biologist of occupied raptor nests in trees and of burrowing owl nesting sites within the boundaries of the proposed subdivision

  • Noise Study

    Noise Study, conducted pursuant to Section 9-10-709, consisting of an assessment of existing and proposed noise contours, and proposed measures to control noise

  • Notice of Hearing10 days

    Notification of any public hearing shall include publication in a newspaper of general circulation within the City at least ten (10) days prior to the hearing.

  • Open Space, Recreation, and Trails Plan

  • Pedestrian, Bicycle, and Transit Connections Plan

    Pedestrian, Bicycle, and Transit Connections Plan

  • Action with no EIR50 days

    If an Environmental Impact Report is not required, the final action on the application shall be rendered within fifty (50) calendar days after it is accepted as complete.

  • Action with EIR45 days

    If an Environmental Impact Report is required, the final action shall be rendered within forty-five (45) calendar days after certification of the Environmental Impact Report.

  • Second Unit Dwelling Plan

    Second Unit Dwelling Plan, showing the location of all required second unit dwellings on a lot by lot basis, in accordance with Section 9-8-1305

  • Sensitive Habitats Map

    Sensitive Habitats Map, showing sensitive habitats, waterways, wetlands, and riparian areas

  • Soundwall Plan

    Soundwall Plan

  • Special Status Species Survey

    Special Status Species Survey, consisting of a survey conducted by a qualified biologist of special status species within the boundaries of the proposed subdivision

  • Street Landscaping Plan

    Street Landscaping Plan, including neighborhood and community entries, showing implementation of CSD Roadway Landscaping Plan

  • Street Lighting Plan

    Street Lighting Plan

  • Tree Survey

    Tree Survey, specifying the location, species, and condition of all mature trees within the proposed subdivision

  • Vehicle Circulation Plan and Roadway Improvement Plan

    Vehicle Circulation Plan and Roadway Improvement Plan

  • Vested Rights Initial Period1 year

    Vested rights shall remain in effect for an initial time period of one (1) year.

  • Will Serve Letters

    Will Serve Letters for all public services and utilities from the CSD and other service providers

From the ordinance

The intent of this Chapter is to provide a method for reviewing and approving Major Subdivision Applications.
Chapter 9-8-19, Sections 9-8-1901 to 9-8-1910