Dimensional standards
Servicing
- Geographic extent
- Areas within the 100-year floodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions. capable of carrying floodwaters without increasing water surface elevation more than one foot
Uses
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- No encroachment without hydrologic analysis
No encroachments, including fill, new construction, substantial improvements, or other development shall be permitted unless it has been demonstrated through hydrologic and hydraulic analyses that the proposed encroachment would not result in any increase in the 100-year flood elevation.
Other
- Recreational vehicle maximum consecutive days180 days
Recreational vehicles placed on sites either be on the site for fewer than 180 consecutive days, be fully licensed and ready for highway use, or meet the permit requirements for placement and the elevation and anchoring requirements for manufactured homes.
From the ordinance
In the floodway district no encroachments, including fill, new construction, substantial improvements, or other development shall be permitted unless it has been demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the proposed encroachment would not result in any increase in the 100-year flood elevation.