Uses
Permitted by right1
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- ARB approval in AP/CP districts
Small cell facilities proposed to be located within an AP or CP district must be approved by the architectural review board pursuant to sections 21-854 and 21-855, in addition to obtaining the administrative permit.
- Abandoned facilities removal60 days
Wireless facilities along with any structures or equipment associated therewith, shall be removed from any property within 60 days upon cessation of use or abandonment.
- Application fee
An application fee of $100.00 for up to five small cell facilities plus $50.00 for each additional small cell facility applied for. No more than 35 locations for small cell facilities may be requested per application.
- Approval timeline60 days
The zoning administrator shall approve or disapprove the application within 60 days of receipt of the completed application, which shall be in writing. The 60-day period may be extended, in writing, for a period not to exceed 30 days.
- Disapproval reasons
A proposed location for installation of a small cell facility may be disapproved for material potential interference with other pre-existing communications facilities, public safety or other critical public service needs, or if the small cell facility is proposed to be installed within an AP and CP District and fails to obtain the necessary approvals of the ARB.
- Micro-wireless exemption
The installation, placement, maintenance or replacement of micro-wireless facilities that are suspended on cables or lines that are strung between existing utility poles in compliance with national safety codes shall be permitted in all zoning districts, and exempt from the administrative permit requirement and fees herein provided.
- Administrative permit required
Small cell facilities when co-located on an existing structure or utility pole on private property are permitted within all zoning districts of the City of Williamsburg with an administrative permit approved by the zoning administrator.