Dimensional standards
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Equipment building setbackSetbackThe distance a building must be held back from a lot line.
Equipment buildings and cabinets must comply with setback regulations of the subject zoning district for accessory structures.
- Local government co-location access
Owners of all new telecommunication facilities shall provide at no cost to the town, co-location opportunities as a community benefit to improve radio communication for town departments and emergency services.
- Maximum number of co-locators4 count
No more than four co-locators shall be allowed on any one telecommunication facility.
- Maximum heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. increase per new user15 ft
Existing towers in any zoning district may be extended to allow for additional users provided that the overall height of the tower is not increased by more than 15 feet for each new user.
- Maximum total heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. for co-location199 ft
The overall height of the structure does not exceed 199 feet.
- Screening of equipment buildings
All equipment buildings and cabinet enclosures shall be screened from public view with fencing and landscaping.
- Special use permitConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote. required if exceeding 199 feet
In a case where the co-location will exceed 199 feet a special use permit shall be required and all local, state and federal requirements shall apply.
From the ordinance
Existing towers may be extended up to 15 feet per new user, max height 199 feet, max 4 co-locators, equipment buildings must comply with setbacks, screening.