West Point, Virginia · General provision

Article IV, Sec. 70-49, 70-50, 70-51, 70-53

Extracted standards

13 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Environmental

  • Erosion and sediment control compliance required

    No zoning permit shall be approved ... until the administrator is satisfied that all applicable requirements of chapter 26 of this Code pertaining to erosion and sediment control have been met.

Other

  • Boundary line adjustment fee25 dollars

    A fee of $25.00 shall accompany each request for approval of a boundary line adjustment.

  • Minimum easement line distance from pipe5 ft

    No easement line shall be located less than five feet from the outside diameter of any pipe, conduit or duct bank.

  • Minimum pavement width for one-way traffic16 ft

    On-site vehicular travel lanes and driveways shall have pavement widths of not less than 20 feet for two-way traffic and 16 feet for one-way traffic

  • Minimum pavement width for two-way traffic20 ft

    On-site vehicular travel lanes and driveways shall have pavement widths of not less than 20 feet for two-way traffic and 16 feet for one-way traffic

  • Minimum utility easement width20 ft

    Utility easements shall be not less than 20 feet in width

  • Plan of development expiration period5 years

    An approved plan of development shall become null and void if no building permit ... within five years of the date of approval

  • Plan of development required for certain uses

    A plan of development shall be required for such uses in such districts as specified in articles VII through XVIII of this chapter pertaining to district regulations.

  • Pre-application conference required

    The applicant shall schedule a pre-application conference with the zoning administrator for all plans of developments.

  • Sidewalks or pedestrian walkways required

    Sidewalks or pedestrian walkways shall be provided so as to enable safe and convenient pedestrian access between buildings located on the site, between buildings and their parking areas, and between buildings and public sidewalks.

  • Sign permit filing fee25 dollars

    A fee of $25.00 shall accompany each application for a sign permit.

  • Zoning permit filing fee25 dollars

    A filing fee of $25.00 shall accompany each application for a zoning permit.

  • Zoning permit validity period12 months

    A zoning permit shall be valid for a period of 12 months from the date of approval

From the ordinance

No building or structure shall be constructed... until a zoning permit... approved. ... A plan of development shall be required... Development standards: pavement widths... utility easements...
Article IV, Sec. 70-49, 70-50, 70-51, 70-53