Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Signage
- NonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. sign damage threshold for removal50 pct
damaged by any casualty to an extent exceeding 50 percent of its replacement cost, shall be removed or made to conform
- NonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. sign restoration timeframe6 months
such sign may be restored as before the damage, if such restoration is completed within six months of the damage.
From the ordinance
Any nonconforming sign damaged to the extent that it represents a public hazard as determined by the building official or zoning administrator or any nonconforming sign damaged by any casualty to an extent exceeding 50 percent of its replacement cost, shall be removed or made to conform to the provisions of this article. In the case of damage of 50 percent or less of the replacement cost of a nonconforming sign damaged by any casualty, such sign may be restored as before the damage, if such restoration is completed within six months of the damage.