Tappahannock, Virginia · General provision

Sec. 22-216

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Bufferyard responsibility

    When a proposed use adjoins a vacant parcel for which a bufferyard is required by the presence of a zoning boundary, that use shall at the time of development provide one-half of the buffer which is required by the Tables of Required Bufferyards. The second use to develop shall, at the time it develops, provide all additional plant material and/or land necessary to provide the total bufferyard required between those two uses.

From the ordinance

When a proposed use adjoins a vacant parcel for which a bufferyard is required... provide one-half of the buffer... The second use to develop shall... provide all additional plant material and/or land necessary to provide the total bufferyard.
Sec. 22-216