Tappahannock, Virginia · General provision

Sec. 22-36

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Bond retention after completion25 pct

    This release shall provide for 25 percent of the total bond to be retained for a period of 12 months after completion of all work.

  • Bond retention period12 months

    This release shall provide for 25 percent of the total bond to be retained for a period of 12 months after completion of all work.

  • Construction standards per appendices

    Unless specifically provided in this chapter, the construction standards for all off-site improvements and on-site improvements required by this article shall conform to the Town design and construction standards contained in Appendices B, C, and D, and standard specifications for water and sewer construction.

From the ordinance

Unless specifically provided in this chapter, the construction standards for all off-site improvements and on-site improvements required by this article shall conform to the Town design and construction standards contained in Appendices B, C, and D, and standard specifications for water and sewer construction.
Sec. 22-36