Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- GradingGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. permit required
Grading Permits. As provided in Tappahannock Sediment and Erosion Control Ordinance.
- Sign permit required
No sign shall be created, erected, moved, added to, or structurally altered, nor shall any of said activities be commenced without a sign permit.
- Zoning permit required for construction or excavation
No building or other structure shall be erected, nor shall any existing building or structure be moved, added to, enlarged, or structurally altered, and no excavation that disturbs over 2,500 square feet shall begin without the issuance of a Zoning Permit therefor by the Zoning Administrator.
From the ordinance
No building or other structure shall be erected, nor shall any existing building or structure be moved, added to, enlarged, or structurally altered, and no excavation that disturbs over 2,500 square feet shall begin without the issuance of a Zoning Permit therefor by the Zoning Administrator.